Rare spider halts pipeline construction

Oklahoman Published: February 26, 2013
Advertisement
;

The rare, federally protected spider that gained fame for stopping a highway project has also blocked a water pipeline.

With less than 1,500 feet to go, construction of a six-mile, $11 million pipeline was halted after the discovery of the endangered Braken Bat Cave meshweaver at Loop 1604 and Texas 151, the board of the San Antonio Water System was told Monday.



Read the rest of this post on the original site »


Advertisement


Trending Now



AROUND THE WEB

  1. 1
    Former OU coach Sunny Golloway goes off at Auburn
  2. 2
    Chelsea Clinton Is Pregnant
  3. 3
    Tulsa World: Missouri’s Frank Haith positioned to become TU’s basketball coach
  4. 4
    Oklahoma football: Peyton Manning stops by Sooners film session
  5. 5
    VIDEO: A look at the Air Jordan XX9 in Thunder colors
+ show more