Construction halted on NC highways for Christmas

Published on NewsOK Modified: December 21, 2013 at 3:01 am •  Published: December 21, 2013
Advertisement
;

RALEIGH, N.C. (AP) — The N.C. Department of Transportation is suspending most construction projects along most interstate, North Carolina and U.S. routes through Jan. 6 as motorists begin their Christmas travel.

In Raleigh, two lanes of the I-40 West ramp onto I-440 West is still down to one lane and I-440 West is two lanes from I-40 toward U.S. 64/264 as a part of the Fortify project.

Bridge work will affect traffic on U.S. 158 in Elizabeth City, while the Wright Memorial Bridge on U.S. 158 West is closed for deck repair. All traffic will use the eastbound bridge.

Bridge construction also affects U.S. 1 north of Aberdeen and U.S. 13 north of Windsor.

I-73 in Greensboro is down to two lanes in each direction between I-40 and I-85 to build a new interchange.



Trending Now


AROUND THE WEB

  1. 1
    Report: Caron Butler close to two-year deal with Detroit Pistons
  2. 2
    It’s harder to be a poor student in the U.S. than in Russia
  3. 3
    Man fatally stabbed in west Tulsa early Sunday
  4. 4
    How brain imaging can be used to predict the stock market
  5. 5
    Bridenstine tours Fort Sill, satisfied with facility's transparency
+ show more