Share “Rare spider halts pipeline construction”

Rare spider halts pipeline construction

Oklahoman Published: February 26, 2013
Advertisement

The rare, federally protected spider that gained fame for stopping a highway project has also blocked a water pipeline.

With less than 1,500 feet to go, construction of a six-mile, $11 million pipeline was halted after the discovery of the endangered Braken Bat Cave meshweaver at Loop 1604 and Texas 151, the board of the San Antonio Water System was told Monday.



Read the rest of this post on the original site »


AROUND THE WEB

  1. 1
    Cat takes a bullet and saves 3-year-old
  2. 2
    What the media, public didn't see when Katrina victims arrived in Oklahoma
  3. 3
    WPX Energy announces $185 million asset sale
  4. 4
    On the death of the postcard
  5. 5
    OKC Thunder's Russell Westbrook marries Nina Earl in star-studded Beverly Hills ceremony
+ show more

FEATURED JOBS



× Trending energy Article